In its bid to expand into the environmental solutions business, Engicon partnered with Fine Hygienic Holding (FHH) to design, finance, and build a process waste water treatment plant (PWTP) for its Arenbeh site in Amman. This 7-year project provides the factory with the ability to treat its waste water and reuse it for industrial purposes.
“It is exciting and gratifying for us to see this project achieving its desired results,” said Abdallah Khair, CEO of Engicon O&M, a subsidiary of Engicon.
“This plant required a very particular design. It is relatively small, but it involves four different treatment technologies in order to reach the standards required by the client.”
The design capacity of the plant is 900,000 thousand litres per day. Almost 80% of the water coming to the PWTP is recycled back to the paper machines